Cambie
Street Bridge
|
|
| The Cambie Street Bridge, in Vancouver, was the largest post-tensioned bridge structure of its kind at that time in Canada consisting of more than 7.8 kilometers of traffic lanes. The schedule was reduced from 26 months to 18 months through acceptance by the owner of a design-build alternative submission. | |
![]() |
![]() |
|
|
|
|
© Copyright 2000. SC Infrastructure |
|